MaryParadox

September 2, 2010

Sierra Buttes Spring Epic Trailwork, May 16th

Filed under: Bikes, Travel — maryparadox @ 3:23 pm

After two days of riding everyone went out the trail and did trailwork. This wasn’t much of a payment for all of the amazing treatment we’d received except for the fact that there was poison oak EVERYWHERE. I covered myself in technu, wore long sleeves and pants, and washed in the ice cold river afterward but I still ended up with poison oak covering half my body. And not the good half.

Lunch.

Peter started doing some basic pruning during his trailwork.

But then it morphed into this dramatic trail widening project which involved moving large boulders. Every man that walked by the project wanted to get involved and eventually pretty much everyone was working on the same 15 feet of trail.

Overall people only worked from about 10am to 2pm at the latest. We probably cleaned up a couple hundred yards of trail, and we probably all got poison oak, so overall it was a good day.

Create a free website or blog at WordPress.com.