MaryParadox

November 22, 2009

Kitchen Remodel: Week 3

Filed under: House, Kitchen — maryparadox @ 6:26 pm
2009-10-29-48 2009-10-29-37
2009-10-29-33 2009-10-29-49

We have plumbing!

Also, it rained in our house. There was a big storm with “wind-driven rain” — i.e. the rain was coming in sideways. The inside of the kitchen got pretty wet with a puddle on the floor and water dripping down the boards (bottom left photo). It looks like some cracks on the back side of the house on the second floor we will need to get sealed up before the drywall is installed.

Advertisements

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: