Things have slowed down dramatically. We have a finish list for the contractor but he doesn’t seem to be working on it very quickly, only about one day per week. But the bathroom is functional, even though the hardwood floor right outside of it is still being refinished.
20090503-957

The list of things to be done by Ed include:

  1. The fan was supposed to be on a timer.
  2. The light for over the mirror came in, so it needs to be installed.
  3. The cornice for the center of the ceiling wasn’t installed.
  4. The wood trim, drywall, paint above sink is messed up and needs to be sanded, filled, painted.
  5. Supplies and trash removed from backyard and garage.
  6. The red chandelier in the living room was broken during construction.
  7. The wood floor, where it was refinished, is matte rather than glossy like the rest of the floor. It seems like maybe another coat or two of finish is required.

The list of things we need to do:

  1. Install toilet paper holder and towel rack.
  2. Put in a shelf to hold spare toilet paper.
  3. Hang a picture.
  4. Pee!
Advertisements

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: