MaryParadox

April 10, 2009

Bathroom Remodel: Day 23-24

Filed under: Mini Bath — maryparadox @ 6:35 pm

On Wednesday the contractor came by and installed the grate over the central-heating air-intake. They reused the grate from the floor but turned it sideways. Not sure if it is the best looking, but it amuses me.

The plumber also came by and installed the toilet! Unfortunately I didn’t realize that you have to buy a toilet seat separately, so it still isn’t super useful. It made me remember that I had ordered a toilet paper holder and a towel rack a couple of months ago but had never received a call saying the shipment had come in. I called the plumbing supply store and they claimed they would have them in by Monday.

20090409-919 20090409-900

On Thursday they came by and installed the backsplash. It looks dark now because the grout is still drying. They are coming back tomorrow to touch up the trim some because they had to mess with it a little to get the marble in. Hopefully they will be installing the mirror too.

20090409-904

Advertisements

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: