Bathroom Remodel: Day 16

Filed under: Mini Bath — maryparadox @ 3:10 pm

Huh?!

I went to Lviv last week for work, and while I was gone the contractor was planning on finishing the bathroom. Instead I came home to this:

20090318-867 20090318-866

Apparently the bathroom became narrower than 30″ at some point, so the bathroom sink no longer fit in. Woohoo the sink is installed, booo for the hoopy installation :(

20090318-869

Running water.

The sink is also a little tall. This is entirely my fault, since I asked them to install it at a taller than normal height. I can live with that, since everyone in our house is tall and we rarely have young guests.

20090318-868

The pipes are much more visible than I expected.

We talked to Ed this morning about the installation. There was a bunch of hand waiving and he claimed he had told us that the sink wasn’t going to fit. Peter and I both thought he hadn’t. Ed says they are going to center the sink better today then close up the hole so that we won’t be able to tell… we’ll see.

Advertisements

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Create a free website or blog at WordPress.com.

%d bloggers like this: